Today I tackled the aft deck installation. First I fabricated the two spacers that have to be inserted between the bulkheads and the deck. On the picture look for the shiny non primed parts/
Before drilling I checked that the fuselage was twist free.
After the drilling, I riveted the skins to the longeron where the aft deck will meet the longeron. Those rivets would be difficult to set once the deck is in place.
I also riveted part of the forward side skin to the longeron where the canopy deck will be positionned.
Working time on this subpart Today : 3h (Total : 5h)
|