Before reinstalling the subpanel and the ribs, I bolt on the park brake valve. The picture shows the end result with the clamp for the control cable.
I then rivte the parts where it's possible before reinstalling the subassembly into the fuselage.
Rveting will ne interesting as access is limited. I begin by riveting th ribs to te firewall. thright side looks OK but I have a problem with the left side. I will change this next time.
Working time on this subpart Today : 2h (Total : 223h)
|