Small parts and drilling

PubliĆ© 27-07-2007 19:06:28
Auteur pg
First I fabricated the four small strips that will hold together the main bulkhead and the fuselage upper longeron, on the picture the two from the right side.



Then I rechecked the alignment of the firewall, the alignment of the weldments on the longeron and the distance from the main bulkhead. I had a small problem centering laterally the firewall, as I had drilled two holes a bit in a hurry. I moved the firewall (my plane will have two more rivets in this area), and drilled all the side skins.



Then I drilled the lower weldment, here is a picture from inside.




Working time on this subpart
Today :  2h (Total : 8h)





Ce blog vient de Notre avion
http://www.notreavion.net

L'URL de ce blog
http://www.notreavion.net/modules/weblog/details.php?blog_id=313