Building log

03-Mar-2012
Wheel fairings
Catégorie: Assembly

Today I installed the wheel fairings, it took a bit longer than expected as I had to widen the gap between the tire and the fairing.
I still have to install the gear leg fairings before resuming flight testing. I hope to gain a few knots on the top speed.

Working time on this subpart
Today :  4h (Total : 124h)

Lectures (3605)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami