Building log

05-Sep-2006
Stiffeners and more
Catégorie: Wings : Fuel tanks

Today, some work on the tanks while waiting for the parts from Vans for the wings. First I disassembled the tanks, the I fabricated the stiffeners that will be riveted to the lower skin. As usual the stiffeners have to be cut, drilled, deburres and dimpled



The I fabricated some small parts for the fuel tank. The fuselage attach angles being the more difficult parts. They ar cut from some heavy aluminium angle and need quite a few cuts and sanding to fit correctly there intended place.




Working time on this subpart
Today :  5h (Total : 6h)

Lectures (2634)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami