Articles
Other informations
Galeries
All the pictures
Building log
From metal to plane
In flight
Taking wings
Home
Building log
15-Sep-2006
Inspection hole
Catégorie:
Wings
:
Fuel tanks
Drilled the fule tank inspection holes. They get drilled with a circle cutter on the innermost rib. The picture shows the finished job. During drilling, the rib has to be clamped down to avid any mishap and a low drill speed has to used (250 rpm).
Lectures (2706)
Précédent
|
Suivant
Status (30 apr 2012)
Time :
2270
hours
In progress
Done
To come
Subparts
Miscellaneous
(14)
Workshop
(11)
Tools
(1)
Empennage
(6)
Hor. stab.
(15)
Vertical stab.
(8)
Rudder
(8)
Elevator
(15)
Tip
(38)
Wings
(7)
Flaps
(7)
Ailerons
(13)
Main spar
(8)
Ribs
(7)
Rear spar
(3)
Skeleton
(14)
Skins
(10)
Leading edge
(20)
Fuel tanks
(40)
Final assembly
(31)
Wingtips
(14)
Fuselage
(5)
Bulkheads
(28)
Rear part
(29)
Center part
(21)
Longeron
(6)
Forward fuselage
(36)
Cabin
(111)
Upper fuselage
(13)
Finishing
(6)
Wiring
(100)
Canopy
(71)
Landing gear
(45)
Engine
(7)
Firewall forward
(81)
Cowls
(52)
Propeller
(13)
Panel
(43)
Assembly
(48)
Main menu
Accueil
Flying
Building log
Archives
Photo album
Articles
Search
Recherche avancée