Building log

09-Nov-2006
Last rib
Catégorie: Wings : Fuel tanks

Today I riveted the las tank rib. Before closing the tanks I still have to finish this rib, by installing the fule pick-up, the different lines and the inspection plate. On the picture you can see the angle that will attach the tank to the fuselage, and the reinforcing plate that goes on the rib inside the tank.




Working time on this subpart
Today :  1h (Total : 67h)

Lectures (2531)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami