Building log

14-Nov-2006
Tubing
Catégorie: Wings : Fuel tanks

Today I finished the inboard rib, I installed the pick-up tubes, the vent line and return line fittings. First I had to apply a Vans Service Bulletin requesting to safety wire the pick-up linre nuts. Here is a picture of both sides.



Then I installed the fittings. I then inspected and cleaned everything. The tanks are now on hold as I'm waiting for the tools to torque the nuts before closing.




Working time on this subpart
Today :  3h (Total : 72h)

Lectures (2769)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami