Building log

09-Mar-2006
Delivery
Catégorie: Wings

The wing kit arrived today with the empennage kit. The two crates are quite heavy (80 and 90 kgs). The longest one contains the wing spars, some center fuselage bulkhead matched to the wingspar and some aluminium angle (4,60m long) to fabricate the fuselage longerons. The shorter crate contains the wingskins and the ribs. This crate was damaged at one corner but everything was still intact inside.


Lectures (3077)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami