Building log

15-Nov-2006
Rigging
Catégorie: Wings : Ailerons

Next I fabricated the ailerons push rods. First they are cut to length, then the inside gets primed.
Each push rod gets bearing at each end, the bearing attach will be riveted to the rod.




Working time on this subpart
Today :  1h (Total : 27h)

Lectures (3389)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami