Building log

25-Nov-2006
Right tank
Catégorie: Wings : Fuel tanks

Closing of the right tank with special thoughts for the Z-brackets. No to many problems. Sabine gave a hand in clecoing and un-clecoing, helping with the pop rivets and part of the final cleaning.
Here is an explanation for the prosealing of the rear baffle. First a line of sealant on and above the rivet line, then when positionning the rear baffle, it acts like a squeegee and normally forms a fillet on the inside of the tank.



This is a picture of the first fuel bay, and it seems the fillet is here. So at least, this side of the first bay should not leak.




Working time on this subpart
Today :  4h (Total : 84h)

Lectures (2717)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami