Building log

10-Apr-2007
Drilling
Catégorie: Fuselage : Rear part

Today I worked in small sessions; first I needed almost two hours to square the aft fuselage. The pictures show the method I used.







Then I drilled the J-channels. First by drilling one hole out of five, putting in the cleco and then drilling the remaining holes. Here is a picture of the first step.



And the interior after the second step.




Working time on this subpart
Today :  4h (Total : 8h)

Lectures (2340)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami