Building log

17-Apr-2006
Prep work
Catégorie: Empennage : Hor. stab.

Today only prep work. As I worked this night, I don't touch any electric or pneumatic device during the day (ask me how I know not to do this), but I prepared all parts to assemble the front spar and all the ribs. I hope to drill everything tomorrow.
Working time on this subpart
Today :  3h (Total : 7h)
Lectures (2695)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami