Building log

05-Jun-2007
Riveting
Catégorie: Fuselage : Rear part

Today I begub the reassembly of the aft fuselage. This begins by riveting the aft blukhead to the small lower skin.
Here is a method I use when the skins are not joining correctly before riveting. I insert a small nylon tubing on the rivet, the tubing gets compressed during riveting and compresses the upper skin to the lower skin during this operation. Here some pictures.







Working time on this subpart
Today :  1h (Total : 28h)

Lectures (2766)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami