Building log

28-Jun-2007
Gage wiring
Catégorie: Wings : Fuel tanks

Before bolting the left fuel tank to the spar, I have to wire the gage. I first used a well documented method to label the wires i.e print the label on the computer and the install it with tranparent heatshrink. I tried printing on the heatshrink but the result doesn't seem very durable.
I then bolted the tank to the spar, albeit only half the screws were accessible as I have to take the wing out of the cradle for the other half.




Working time on this subpart
Today :  2h (Total : 97h)

Lectures (3219)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami