Building log

14-Jul-2007
Riveting
Catégorie: Fuselage : Rear part

In three hours (we included some time to view the Tout de France stage arrival) we managed to rivet all the lower skin and part of one of the side skins. We used a mix of traditional riveting with the mushroom set and some backriveting.




Working time on this subpart
Today :  3h (Total : 45h)

Lectures (2392)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami