Building log

16-Jul-2007
The beginning
Catégorie: Fuselage : Forward fuselage

The building of the forward fuselage begins with the assembly of the rear and center parts with the longerons.
This is done with the parts upside down on sawhorses. Then the forward sideskins get clecoed on. Here is the result.








Working time on this subpart
Today :  1h (Total : 1h)

Lectures (2463)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami