Building log

25-Apr-2006
Prep work before priming
Catégorie: Empennage : Vertical stab.

The stabilizer is quasi ready for priming. Today all the holes got drilled, deburred The skeleton is dimpled and the skin is nearly finished. I was to call it a day when the male dimple die slipped on the next to last hole and created a perfect eight dimple. It should be repairable, waiting on the specialist's advice.




Working time on this subpart
Today :  3h (Total : 6h)
Lectures (3188)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami