Building log

25-Aug-2007
Seatbacks...again
Catégorie: Fuselage : Cabin

Two hours work were needed to preassemble one of the seatbacks. There are quite a few parts to assemble, a lot of measuring and drilling to do.
Here is the result with two vertical angles, two horizontal angles, three hinges and the lightening holes in the part in the back.




Working time on this subpart
Today :  2h (Total : 3h)

Lectures (2302)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami