Building log |
![]() |
15-Jan-2008
Sanding and air scoops
|
The session begins with the sanding of the remaining parts : forward skin and panel structure. Then I installed the two fresh air scoops. They will be prosealed to the skin but I decided to use a few rivets to hold the scoop while the proseal is setting. To avoid braking the scoop during riveting, I fabricated a one piece shim with some leftover aluminium sheet. It didn't take to long and looks nice. Working time on this subpart Today : 2h (Total : 111h) |
Lectures (2495)