Building log

15-Jan-2008
Sanding and air scoops
Catégorie: Fuselage : Cabin

The session begins with the sanding of the remaining parts : forward skin and panel structure.



Then I installed the two fresh air scoops. They will be prosealed to the skin but I decided to use a few rivets to hold the scoop while the proseal is setting. To avoid braking the scoop during riveting, I fabricated a one piece shim with some leftover aluminium sheet. It didn't take to long and looks nice.




Working time on this subpart
Today :  2h (Total : 111h)

Lectures (2288)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami