Building log

05-May-2006
Priming and assembly
Catégorie: Empennage : Hor. stab.

Today I made big progress, at least visually. The morning was devoted to priming all the parts. This step went quite well considering working with a paint gun was a first for me. Although a professional painter would not be as happy as I am with the result.
The paint and the gun are quite easy to use, I chose a HVLP gun which reduces painting mist and runoff risks.



Then another big step, the first rivet : it's painted orange just to remember it.



Then I assembled the rear spar, Guillaume squeezed a few rivets.



And here is the finished spar.




Working time on this subpart
Today :  5h (Total : 34h)

Lectures (4388)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami