Building log

18-Feb-2008
Rivetting the rollbar
Catégorie: Fuselage : Cabin

The compressor being repaired (the cylinder head seal was broken), rivetting can begin. First I reassemble the rollbar, the foward part is riveted with plain rivets after the joining plate has been riveted into position and the reinforcing strips installed.



The rear part gets riveted with pop rivets as the rear of the part is now inaccessible. On the inside I have more rivets than on the plans due to my small problems while drilling the parts. On the rear face I also installed the angles that will support the brace between the rollbar and the liggage bulkhead.




Working time on this subpart
Today :  3h (Total : 140h)

Lectures (2690)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami