Building log

13-Mar-2008
Fairing
Catégorie: Fuselage : Rear part

After a long time, I'm back in the workshop. I'm still working on the empennage fairing. The left side is tweaked a bit by heating the part and tying it down. Then I drill all the holes. There will be some more work to do, but only when it will be fiberglass time.



Then I remove the whole empennage from the fuselage. A lot of nutplates have to be installed : 12 on the vertical stab, 10 on the horizontal stab, 8 for the inspection plates and 7 on the fuselage.



On the fuselage I only made the drilling and deburring. I think the dimpling and riveting will be interesting as there is little access.




Working time on this subpart
Today :  4h (Total : 71h)