Building log

24-Mar-2008
Small riveting
Catégorie: Fuselage : Cabin

A few parts were ready to be riveted, so I started with these.
First the small angles the panel will be bolted on.



Then the two firewall reinforcing parts. The grey color will be used for the visible interior parts (except the panel). It's a hammered effect paint.



And last, the parking brake valve support bracket.




Working time on this subpart
Today :  1h (Total : 149h)

Lectures (2390)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami