Building log

26-Apr-2008
Miscellaneous
Catégorie: Finishing : Canopy

First the workshop gets a spring clean-up. Then I rivet the clips to canopy reinforcing braces.



I cleco again all the skins to try to find where my small problems might be. I have a small problem with the right hinge binding a bit. Then I simulated the shims needed to raise the skin at the center, still quite thick. I'll fabricate them later as the frame is supposed to move during the installation of the struts and of the canopy.




Working time on this subpart
Today :  1h (Total : 58h)

Lectures (2197)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami