Building log

11-May-2006
Skin riveting
Catégorie: Empennage : Hor. stab.

Riveting of the horizontal stab's skins begins with the riveting of an intermediate rib before assembling the forward spar. I stopped working on the parts after running into some trouble bucking rivets. After having drilled out some, I trained again on some scrap parts, I was in fact using to much air pressure in my tool.




Working time on this subpart
Today :  3h (Total : 40h)

Lectures (3758)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami