Building log

15-May-2006
Finished riveting
Catégorie: Empennage : Hor. stab.

The horizontal stab is now completely riveted. All went well with only a few rivets to drill out. The only remaining work is now the tips, but I first have to find and buy the epoxy products.The inside with the rivets shop heads and the pop rivets that are sometimes used.



And the finished product.




Working time on this subpart
Today :  4h (Total : 45h)

Lectures (3521)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami