Building log

15-Aug-2008
Re-assembly
Catégorie: Fuselage : Cabin






Then I reinstall the parts of the side lock. It had to be tweaked a bit after the installation of the yellow knob.




Then I rivet the central support for the rudder pedals tube. The rudder pedals and brakes will be installed shortly.




Working time on this subpart
Today :  2h (Total : 170h)

Lectures (2347)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami