Building log

03-Sep-2008
Filler
Catégorie: Empennage : Tip

First task is to finish the bonding of the remaining fiberglass strips.
Then I mx up some epoxy and microballoons to begin filling all the gaps. The slurry is a bit to dry to be applied perfectly. I'll wait for it to dry, then do some sanding tests and then try to perfect my work.




Working time on this subpart
Today :  2h (Total : 23h)

Lectures (2338)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami