Building log

07-Sep-2008
Sanding
Catégorie: Empennage : Tip

The weather being to bad to fly to the general assembly of the Van's Club de France in Roanne (center of France), I work on the tips with a first session of sanding. The epoxy-microballoon is quite hard to sand once cured.
Then I continue filling the seven tips and notice that some have not been done yet (there are two sides per tip).

Working time on this subpart
Today :  2h (Total : 29h)

Lectures (2263)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami