Building log

07-Oct-2008
Priming soon
Catégorie: Empennage : Tip

Today I had quite a bit done, the vertical stabilizer and left elevator tips are sanded and ready to be primed. So I have five tips ready to be painted.
The upper rudder tip is ready for final sanding and the lower tip got some filler again after the problem discovered yesterday.


Working time on this subpart
Today :  2h (Total : 54h)

Lectures (2319)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami