Building log

04-Nov-2008
Vents...again
Catégorie: Fuselage : Cabin

I finished fabricating the vent support bracket and adpated the angle that will be installed under the instrument panel. Here the right side.



And here the left side with an early idea of the cut line and the headset jacks position.



I also modified the brake fluid reservoir connection to the brake lines, I didn't like Vans' plastic tee, so I used an aluminium one with a union and two elbows.




Working time on this subpart
Today :  2h (Total : 193h)

Lectures (2633)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami