Building log

15-Jun-2006
Right elevator
Catégorie: Empennage : Elevator

Still working ont the elevator. First, all the parts were primed, then I begun assembling the right elevator. Some difficult to set rivets made this a longer than anticipated task. There remains only one rivet to be set, it's were the clamp is on the picture (the clamp holds tight skins and ribs glued with some epoxy so that they remain bonded during riveting)




Working time on this subpart
Today :  4h (Total : 35h)

Lectures (2821)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami