| Building log |
|
25-Jun-2009
|
Sanding
|
Both cowls have been sanded, some small places needed more filling. The time for the first paint is approaching. Working time on this subpart Today : 2h (Total : 120h) |
Lectures (2593)
| Time : 2270 hours |
![]() |
|
In progress |
|
Done |
|
To come |
Miscellaneous(14)
Workshop(11)
Tools(1)
Empennage(6)
Hor. stab.(15)
Rudder(8)
Elevator(15)
Tip(38)
Wings(7)
Flaps(7)
Ailerons(13)
Main spar(8)
Ribs(7)
Rear spar(3)
Skeleton(14)
Skins(10)
Leading edge(20)
Fuel tanks(40)
Final assembly(31)
Wingtips(14)
Fuselage(5)
Bulkheads(28)
Rear part(29)
Center part(21)
Longeron(6)
Forward fuselage(36)
Cabin(111)
Upper fuselage(13)
Finishing(6)
Wiring(100)
Canopy(71)
Landing gear(45)
Engine(7)
Firewall forward(81)
Cowls(52)
Propeller(13)
Panel(43)
Assembly(48)