Building log |
20-Jun-2006
Leading edge rolling
|
This morning I assembled the trim tab and the left elevator. First the alignment is to be checked, then the elevator side of the hinge is drilled and to finish everything is riveted together. Then the leading edges get rolled. The skins are thicker than those of the rudder, a little manual help is needed to get a correct shape. I ended the day by installing the trim tab servo, as all the builders before me, I had to file the edges of the hole to get it into position. Working time on this subpart Today : 4h (Total : 45h) |
Lectures (3690)