Building log

21-Sep-2009
First install
Catégorie: Propeller

I have some help staying at home, so we decided to tackle some work easier to do being two.
We store the canopy and take the propeller out.
First thing is to install the extension on the prop. This is no easy task without a press. We tried the rivet gun, then a small hammer and finished with the 5lbs hammer suggested by Sensenich..



Then the prop got bolted to the crankshaft. Muy dad, the helper seems quite satisfied with the result. We still have to clock it properly, install the forward flange and spinner.
Space is beginning to be scarce, we had to remove the door handle to be able to close the workshop.




Working time on this subpart
Today :  2h (Total : 2h)

Lectures (2214)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami