Building log

25-Sep-2009
Dust
Catégorie: Finishing : Landing gear

Almost four hours where needed to sand all the wheel fairings and the empennage fairing. All the parts were done with 180 grit, those ready for paint were then sanded with 320 grit. Some parts still had some defects but there were very few.


Working time on this subpart
Today :  4h (Total : 91h)

Lectures (2404)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami