Building log

15-Dec-2009
Nutplates
Catégorie: Finishing : Wiring

After some workshop cleaning, I installed the four nutplates for the GPS antennas' shelve.



I also installed some nutplates on the upper firewall angle. This is to install some clamps for the wire routing.




Working time on this subpart
Today :  2h (Total : 25h)

Lectures (2354)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami