Building log

27-Feb-2010
A few rivets
Catégorie: Fuselage : Cabin

I needed almost two hours to set a dozen of rivets. It was almost impossible to use the squeezer or the gun. I had to drill a few rivets and used a few pop rivets.




Working time on this subpart
Today :  2h (Total : 228h)

Lectures (2242)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami