Building log

29-Sep-2005
Building permit
Catégorie: Workshop

Today we have applied for a building permit for our workshop. The workshop will be smaller than previously planned, only 18ft by 12ft. It should be a bit to small but we'll have to live with this. We'll have to organize the storage outside of the workshop : garden shed, garage....
We now wait to know if the permit is granted, should take maximum two months.
Lectures (3203)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami