Building log

02-Mar-2010
Rivets and paint
Catégorie: Fuselage : Cabin

I had to set a few missing rivets at the top of the fuselage frames. These are the first four.



Then some more above the luggage hold.



And those on the canopy brace. I then masked (not so well) the cabin to paint all the apparent parts.
The end result looks quite good, we'll try not to mess up doing the finishing.




Working time on this subpart
Today :  3h (Total : 233h)

Lectures (2504)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami