03-Mar-2010
Assembly
Catégorie: Panel

It's now time to begin the assembly of the panel elements. I begin by installing the GPS antennas.



Both antenna cables have to penetrate the firewall but one connector being very big I don't want to drill a hole this side. I will use a split grommet and have the wires go through a hole at the top of the firewall.



This is how it looks ont the firewall.



And this is the stainless steel shield I made that will be screwed on later.



I installed a few items on the subpanel.



And then I bolted the fuseblock on the hinged panel.




Working time on this subpart
Today :  3h (Total : 102h)