Building log

05-Mar-2010
Thinking
Catégorie: Finishing : Wiring

After some cleaning, I worked a bit on the wiring. Ths drawings are almost complete but the transpostion to the real world show some suprises. Some sizes of connectors missing, a fuse to add on a wire that is too long to be left unfused, the clamps to install, etc.. This is better done with the hand on the real hardware, so I spent some time staring at the fuselage.


Working time on this subpart
Today :  2h (Total : 28h)