Building log

26-Mar-2010
Flaps
Catégorie: Finishing : Wiring

The first systeme getting wired is the flaps system. There is the positionning CPU, a switch, a motor, and a position transmitter. This makes up for a few wires that have to be cut, marked.




Working time on this subpart
Today :  4h (Total : 35h)