Building log

14-Jun-2010
VHF-NAV and transponder
Catégorie: Finishing : Wiring

Today, I reinstalled the VFH and the trnasponder in the panel. Tomorrow I will install the headset plugs. I will then have almost all the wires in the cabin and be able to tackle the routing and the connexions.


Working time on this subpart
Today :  2h (Total : 116h)

Lectures (2325)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami