| Building log |
|
02-Aug-2010
|
Switches..ter
|
I almost finished wiring the switches. I then completed the wiring of the flaps potionning module. Some markins had to be redone wiche always takes some time. For the pane, I have the autopilot connectore to install and the intercom to wire, then I will try to tidy up all the wiring. Working time on this subpart Today : 3h (Total : 140h) |
Lectures (2728)






Miscellaneous
Tools