Tidying up..bis
Catégorie: Finishing : Wiring

I go on tidying up the wiring behind the panel. This is was the back of the row of switches looks like.



I then install the autopilot command box to check if the wiring clear the box with enough distance. This side looks good.



This is a picture of the other side, the box is behind the rib with the terminal strip. Initially I wanted to fasten the harness to the bottom flange of the rib, but this would mean putting a tight bend in the harness, so I will have to find another way.



I also arranged some other wires, among them those of the flaps positionning system.




Working time on this subpart
Today :  3h (Total : 146h)