Building log

05-Aug-2010
GPS, tidying up..next
Catégorie: Finishing : Wiring

I first fabricate the Garmin 496 harness.
I then continue tidying up all the wiring. I run into some troubles as the wires crisscross each other on no particular order. I have to open some connections and cut some wires.
The problems arise from the fact that the wiring fabrication was done without any method and order. The only consequence so far is the time lost sorting all out.


Working time on this subpart
Today :  4h (Total : 150h)

Lectures (2201)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami