Building log

07-Aug-2010
First amps
Catégorie: Finishing : Wiring

I first rearrange the wirings runs along the floor and crimp some missing terminals.



The intercom will be done later so I now have to wire the fuse blocks



And after having installed the EFIS and flipped the corresponding switch, here is the result.




Working time on this subpart
Today :  3h (Total : 159h)

Lectures (2289)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami